Arodi's General Construction

Our Portfolio

Kitchen Cabinets Installation

Installed a full set of new kitchen cabinets, including uppers, lowers, and hardware. Cabinets were leveled, secured, and finished with trim for a clean, built-in look that fits the space precisely.

Kitchen Cabinets

Back Door Replacement 1st and 2nd Floor

Removed and replaced exterior back doors on both the first and second floor, including new frames, weatherstripping, and hardware. Doors were sealed and finished for a tight, secure fit.

Finish Carpentry

Slider Door Replacement

Removed the old sliding glass door and installed a new slider, including frame alignment, weatherproofing, and hardware. The finished install operates smoothly and seals tightly.

Finish Carpentry

Sink Replacement

Removed the old sink and replaced it with a new unit, including new plumbing connections, fittings, and sealant. Finished with a clean, leak-free installation.

Finish Carpentry

Tile Floor

Removed the old flooring and installed new tile, including underlayment prep, layout, cutting, and grouting. The finished floor is level, durable, and water-resistant.

Finish Carpentry

Staircase Renovation

Removed the old stair treads and installed new wood treads and risers. Replaced the newel posts and installed new spindles. Sanded and stained all the wood steps, then painted the risers and trim for a clean, updated look. The finished staircase is strong, durable, and has a fresh modern appearance.

Finish Carpentry

Curved Staircase Rebuild

Removed the old carpet and post, then rebuilt the staircase with a new post, new risers, a new stringer, and new steps. Since the stringer was curved, we added extra layers on both sides to reinforce it for a strong, solid structure. The original handrail was reused for a seamless finished look.

Finish Carpentry

Hardwood Floor Refinishing

Sanded down the existing hardwood floor to bare wood, repaired any damaged spots, then stained and sealed it with several coats of finish for a smooth, updated look.

Flooring

Laminate Flooring Installation

Removed old flooring and trim, then installed new laminate flooring throughout, including underlayment, transition strips, and fresh baseboards for a clean, finished edge.

Flooring

Floor Refinishing

Refinished the existing floor, including sanding, repairs, staining, and sealing, to restore it to a smooth, like-new condition.

Flooring

Deck Stair Repair

Repaired damaged deck stairs, replacing worn treads, stringers, and railings as needed. Rebuilt sections were secured and finished to match the existing deck for a safe, sturdy result.

Decks

Yard Table

Built a custom outdoor yard table from scratch, including framing and tabletop assembly, finished to hold up to outdoor use.

Decks

Back Fence Gate

Built and installed a new back fence gate, including framing, hinges, and a secure latch, matching the height and style of the existing fence.

Decks

Custom Pool Deck

Designed and built a custom deck around the pool area, including framing, decking boards, and finish work, built to handle outdoor and pool-side conditions.

Decks

TV Installation with Concealed Wiring

Mounted a TV on the wall with all wiring run inside the wall for a clean, cordless look, including mount installation, in-wall cable routing, and outlet/plate finishing.

Low Voltage

TV Wall Mount with Additional Outlet

Customer wanted a TV mounted on the wall along with an additional outlet installed behind it, so the TV, mount, and power connection all sit flush together for a clean, finished look.

Low Voltage

Rear Gate Exit Reader

Installed a low-voltage exit reader system at the rear gate for controlled access, including wiring, mounting, and connection to the access control system.

Low Voltage

Deck LED Lighting

Installed low-voltage LED lighting along the deck, including wiring, fixture placement, and a transformer/control setup for even, ambient lighting at night.

Low Voltage